+27(0)21 023 0381 info@stacmechanical.co.za
Home 9 2019 9 40 Burg Street

Client Name

40 on Burg

Project Value

R0.75m

Project Completion

2019

Services

Design, Documentation, Construction, Monitoring

Project Description

40 Burg Street is situated in the city centre of Cape Town and consisting of 7 floors. The building is a historic building.

The project scope included renovating the building and re-zoning it as a boutique hotel.

As part of the scope of work, new fire plans were developed. A fire detection system was installed, and the existing fire protection services were renovated, and new hose reels and a booster connection was added. The lobby is protected by fire shutters.

A new kitchen extract system, ventilation supply systems, bathroom extract systems and a lift shaft pressurisation system were installed.
A new water storage tank and variable speed pump installation including hot water geysers and heat pumps were installed as part of the renovations.

Unique Features and Challenges

  • Historic building
  • Limited space on the building site
  • Adjacent buildings